Project Identity:
The project involved the procurement and installation of a new telemetry network for measuring water level, velocity, and flow calculation at various locations based on the needs of GOEV, as recorded. It includes both the supply and the installation and commissioning of the new equipment.
The aim of this project is to upgrade the irrigation systems of GOEV in the plains of Thessaloniki-Lagadas and to improve the management and monitoring of water flows within the irrigation network. The expected results include reducing water leaks, conserving water resources, and creating conditions for a more efficient and intelligent control of the irrigation network.
Measured Parameters
3rd International Conference DESIGN AND MANAGEMENT OF PORT, COASTAL AND OFFSHORE WORKS
7-9 MAY 2025
CONFERENCE & CULTURAL CENTER OF THE UNIVERSITY OF PATRAS | PATRAS, GREECE
On-line quality parameters monitoring systems
WATER QUALITY AND METEOROLOGICAL STATION IN THE SALT LAGOON OF AEGIALIA MUNICIPALITY
Water quality and meteorological station
EASTERN MACEDONIA & THRACE (G.O.E.V. ORESTIADAS)
Telemetry Network for Water discharge Measurement